Engineering Services

Road Opening Fee (New Construction or Utility Connection)

TopicsFees
(1) Inspection$200, minimum or 5% of the total cost of project
(2) Cash bond$500, minimum bond 10 linear foot, inspection 5% of bond amount


Road Opening Fee for Excavations in New Street Improvement

TopicsFees
(1) Within one year$850
(2) Third and fourth years$600
(3) Year five$400
(4) Driveway/Sidewalk replacement fee application and inspection$50


Soil Movement Permit

TopicsFees
(1) Up to 10 cubic yards$150
(2) Over 10 cubic yards$150 plus $0.25 for each additional cubic yard


Lot Grading Permit

TopicsFees
(1) Lot grading permit$100
(2) With lot grading plan$300 additional


Flood Map Certification

TopicsFees
Flood map certification$20


Topography Map Fee

TopicsFees
Topography map fee$60/sheet


Engineering Inspection Fee

TopicsFees
(1) Developments5% of improvement costs
(2) Non-residential site5% of improvement costs


Large Map Copies

TopicsFees
Large map copies$5